Integrated Plumbing Systems
Installation in Five Easy Stages

Stage 1
Using the site preparation drawings provided by Cubicle Systems, the plumber installs first fix water supply using flexible, isolating pipework, plus the soil pipework. Any other concealed services are also fitted at this stage. The washroom installer fixes IPS floor and wall tracks into position.
Stage 2
The IPS frames, with cisterns pre-fitted where appropriate, are located into the floor and wall tracks by the washroom installer, centred on the soil pipework. Frames are adjusted for height, plumb and level then securely fixed to tracks.
Stage 3
Decorative frame infill spacer panels, skirting and ceiling scribes are fitted into place.
Stage 4
The lower decorative access panels and sanitaryware are refitted by the washroom installer and coupled to the water supply and soil pipework. The plumber tests the system for leaks and completes any service work.
Stage 5
The installation fully tested, the washroom installer fits the remainder of the decorative access panels and applies silicon joint sealant where necessary. Cubicles can now be fixed into position as required.